zathras
08-01-2008, 09:06 PM
The main thread for the construction progress is over in the other section, but here's a few before & after shots.
Planning took place from 6/2007 - 8/2007.
Construction began on 10/15/2007 and finished in early December.
This is what we looked like beforehand
http://www.zathras.com/pix/basement/preview_ne_corner.jpg
A real mess
http://www.zathras.com/pix/basement/preview_ne_to_sw.jpg
Here is where I'm sitting right now. This pic is from right in front of the screen, looking thru the poker area, to the bar.
http://www.zathras.com/pix/basement/final%20005.jpg
A close up of the bar
http://www.zathras.com/pix/basement/final%20007.jpg
The theater area- inwall speakers, an IR-repeater to capture and send remote control signals to the A/V closet, a plug-in for xbox360, home made 100" screen, bordered by black velveteen- turned out better than I imagined.
http://www.zathras.com/pix/basement/final%20004.jpg
Planning took place from 6/2007 - 8/2007.
Construction began on 10/15/2007 and finished in early December.
This is what we looked like beforehand
http://www.zathras.com/pix/basement/preview_ne_corner.jpg
A real mess
http://www.zathras.com/pix/basement/preview_ne_to_sw.jpg
Here is where I'm sitting right now. This pic is from right in front of the screen, looking thru the poker area, to the bar.
http://www.zathras.com/pix/basement/final%20005.jpg
A close up of the bar
http://www.zathras.com/pix/basement/final%20007.jpg
The theater area- inwall speakers, an IR-repeater to capture and send remote control signals to the A/V closet, a plug-in for xbox360, home made 100" screen, bordered by black velveteen- turned out better than I imagined.
http://www.zathras.com/pix/basement/final%20004.jpg